我們已在上線! 進一步了解
IAUX圖示

i-80 Gold Corp

1.52 USD
-0.01
0.65%
收盤時 已更新 10月16日 下午4:00 EDT
1天
-0.65%
5天
-3.18%
1個月
-7.88%
3個月
20.63%
6個月
-5.59%
今年迄今
4.83%
1年
38.18%
5年
-43.91%
10年
-43.91%
 

關於: i-80 Gold Corp is a well-financed gold and silver producer engaged in the exploration, development, and production of gold, silver, and poly-metallic deposits. The Company's principal assets include the Ruby Hill Mine, Lone Tree Mine, Granite Creek Mine, and McCoy-Cove Project.

員工: 133

新聞

正面
中性
負面
市場情緒 3個月
正面 33.3%
中性 66.7%
負面 0%
中性
PRNewsWire
前天
i-80 Gold Provides a Development Update; Archimedes Underground and Lone Tree Plant Refurbishment Remain on Track and Mineral Point Open Pit Prioritized in Updated Development Plan
All amounts are expressed in United States dollars unless otherwise stated. TORONTO, Oct. 14, 2026 /PRNewswire/ -- i-80 GOLD CORP.
i-80 Gold Provides a Development Update; Archimedes Underground and Lone Tree Plant Refurbishment Remain on Track and Mineral Point Open Pit Prioritized in Updated Development Plan
中性
PRNewsWire
21 天前
i-80 Gold Publishes its 2025 Sustainability Report
TORONTO, Sept. 25, 2026 /PRNewswire/ -- i-80 GOLD CORP.
i-80 Gold Publishes its 2025 Sustainability Report
中性
PRNewsWire
24 天前
i-80 Gold Announces Initial Assay Results From Mineral Point Open Pit Project in Nevada Including a Step-Out Hole of 1.33 g/t Au and 39.2 g/t Ag Over 225.6 Meters
TORONTO, Sept. 22, 2026 /PRNewswire/ -- i-80 GOLD CORP.
i-80 Gold Announces Initial Assay Results From Mineral Point Open Pit Project in Nevada Including a Step-Out Hole of 1.33 g/t Au and 39.2 g/t Ag Over 225.6 Meters
中性
PRNewsWire
25 天前
i-80 Gold Announces Positive Feasibility Study and Initial Mineral Reserves for Granite Creek Underground; After-Tax NPV(5%) of $118 Million at $2,750/oz Au Increasing to $598 Million at $4,500/oz Au
TORONTO, Sept. 21, 2026 /PRNewswire/ -- i-80 GOLD CORP. (NYSE: IAUX) (TSX: IAU) ("i-80 Gold", or the "Company") is pleased to announce the results of a feasibility study for the high-grade Granite Creek underground gold project ("Granite Creek Underground" or the "Project"). The Project is situated at the intersection of the highly prolific Battle Mountain-Eureka and Getchell gold trends in northern Nevada, USA. Granite Creek Underground is currently ramping up production and is expected to produce between 30,000 to 40,000 ounces of gold in 2026.
i-80 Gold Announces Positive Feasibility Study and Initial Mineral Reserves for Granite Creek Underground; After-Tax NPV(5%) of $118 Million at $2,750/oz Au Increasing to $598 Million at $4,500/oz Au
正面
Seeking Alpha
上個月
I-80 Gold: Unrivaled Growth With Maiden Reserves On Deck
i-80 Gold Corp. remains deeply undervalued, trading at ~0.36x P/NAV, with an industry-leading growth profile and a fully funded development pipeline in Nevada. Production is set to nearly quadruple by 2030, targeting ~700,000 GEOs in its year peak, driven by Granite Creek UG, Archimedes UG, higher payabilities (autoclave), and a fast-tracked Mineral Point. A well-timed recapitalization has transformed the IAUX balance sheet, and with other gold+silver peers in Ti-1 jurisdictions trading near 2.0x P/NAV (7%), IAUX has massive re-rating potential.
I-80 Gold: Unrivaled Growth With Maiden Reserves On Deck
正面
The Motley Fool
上個月
i-80 Gold CEO Richard Scott Young Buys 1 Million Shares. What Does This Mean for Investors?
Young acquired 1.0 million shares at $1.62 per share, representing a total capital commitment of $1.62 million on August 18, 2026. The transaction increased the executive's direct equity holdings by 20%, bringing his total direct and indirect position to ~6.3 million shares.
i-80 Gold CEO Richard Scott Young Buys 1 Million Shares. What Does This Mean for Investors?
負面
Invezz
3 個月前
Gold hits 7-month low: 3 'strong buy' stocks with 100%+ upside potential
Gold has dropped below $4,000 an ounce, but Wall Street is not giving up on every corner of the gold trade. Spot bullion slipped to a seven-month low near $3,981, pressured by a stronger US dollar and rising expectations that the Federal Reserve may keep rates higher for longer.
Gold hits 7-month low: 3 'strong buy' stocks with 100%+ upside potential
正面
Seeking Alpha
4 個月前
i-80 Gold: Recapitalized, De-Risked, And Still Deeply Undervalued
i-80 Gold has recapitalized, eliminating going concern risk and enabling disciplined execution of its Nevada-focused multi-asset development plan. Granite Creek ramp-up and Archimedes Underground construction are progressing, with near-term catalysts including first gold from Archimedes in Q4 and Lone Tree autoclave refurbishment. Despite a net loss and heavy pre-production spending, IAUX holds $514M in cash, is fully funded for phases 1 & 2, and targets sustainable cash flow by late 2027.
i-80 Gold: Recapitalized, De-Risked, And Still Deeply Undervalued
中性
Seeking Alpha
5 個月前
i-80 Gold Corp. (IAU:CA) Q1 2026 Earnings Call Prepared Remarks Transcript
i-80 Gold Corp. (IAU:CA) Q1 2026 Earnings Call Prepared Remarks Transcript
i-80 Gold Corp. (IAU:CA) Q1 2026 Earnings Call Prepared Remarks Transcript
中性
PRNewsWire
6 個月前
i-80 Gold Reports High-Grade Assay Results at Archimedes Underground Project Including 24.6 g/t Au Over 23.6 Meters; Development Advancing on Schedule
TORONTO, April 8, 2026 /PRNewswire/ - i-80 GOLD CORP. (TSX: IAU) (NYSE American: IAUX) ("i-80 Gold", or the "Company") is pleased to announce assay results from its recent drilling campaign at the Archimedes Underground Project ("Archimedes" or the "Project"), located on the Company's Ruby Hill property at the southeastern end of the Battle Mountain-Eureka Trend in northeastern Nevada, United States (see Figure 1 in Appendix).
i-80 Gold Reports High-Grade Assay Results at Archimedes Underground Project Including 24.6 g/t Au Over 23.6 Meters; Development Advancing on Schedule
價格圖表採用Lightweight Charts™實作