EV Charging Infrastructure
Charging networks are the refuelling system for electric vehicles, split between fast chargers on main routes and slow chargers where cars already sit. Utilisation, not the number of plugs installed, decides whether an operator makes money.
21 stocks
| # | Name |
Funds holding | Growth | Growth % |
Fund value |
|
|---|---|---|---|---|---|---|
| 1 |
1
BP
BP
$126B
| 893 | -17 | -2% | $11.4B |
|
| 2 |
ABB
2
DELISTED
ABB Ltd
ABB
| 308 | +16 | +5% | $1.87B |
|
| 3 |
3
Pioneer Power Solutions
PPSI
$31.4M
| 13 | +3 | +30% | $12.3M |
|
| 4 |
4
ADS-TEC Energy
ADSE
$726M
| – | – | – | – |
|
| 5 |
5
DELISTED
Allego N.V.
ALLG
| – | – | – | – |
|
| 6 |
6
Beam Global
BEEM
$22.5M
| – | – | – | – |
|
| 7 |
7
Blink Charging
BLNK
$65.9M
| – | – | – | – |
|
| 8 |
8
ChargePoint
CHPT
$179M
| – | – | – | – |
|
| 9 |
DCFC
9
DELISTED
Tritium DCFC Limited Ordinary Shares
DCFC
| – | – | – | – |
|
| 10 |
10
EVgo
EVGO
$154M
| – | – | – | – |
|
| 11 |
11
Gogoro
GGR
$62.2M
| – | – | – | – |
|
| 12 |
12
Huachen AI Parking Management Technology
HCAI
$3.05M
| – | – | – | – |
|
| 13 |
13
NaaS Technology Inc
NAAS
$50.5M
| – | – | – | – |
|
| 14 |
14
DELISTED
Nuvve Holding Corp
NVVE
| – | – | – | – |
|
| 15 |
15
DELISTED
Nxu, Inc. Class A Common Stock
NXU
| – | – | – | – |
|
| 16 |
NXXT
16
NextNRG Inc
NXXT
$9.46M
| – | – | – | – |
|
| 17 |
VLTA
17
DELISTED
Volta Inc.
VLTA
| – | – | – | – |
|
| 18 |
18
Vontier
VNT
$4.38B
| – | – | – | – |
|
| 19 |
19
Wallbox
WBX
$64.5M
| – | – | – | – |
|
| 20 |
XCH
20
XCHG Ltd
XCH
$8.84M
| – | – | – | – |
|
| 21 |
21
ZOOZ Strategy Ltd
ZOOZ
$51.3M
| – | – | – | – |
|